Work Day

May 16, 2026 8:00 AM

 - 1:00 PM

Work Day

Help in beautifying our campus indoors and out doing small projects like mulching, cleaning, fixing, planting, raking, patching, painting and assisting with lunch. A list of projects and descriptions are below.


Projects:

Click the project to learn more

  •  Move the VBS Water day frame to the area behind the upper building water day frame to the area behind the upper building.
  • Gather and load concrete block onto pickup truck onto the pickup truck.
  • Place other trash/debris in the dumpster
  • Sweep the area inside the dumpster enclosure
  • Move the basketball hoop to the upper parking lot
  • Sweep parking spots
  • Prune trees to allow vehicles to park 
  • Move the left gate stake lower to allow holding the door open drill new bolt holes in the wood, and support pipe
  • Dig approx. 3'x3' area to a depth of 5"
  • Retain dirt in the area for use after concrete replacement
  • Place 2" of 2A gravel
  • Place 1" of crushed gravel
  • Level crushed gravel to a depth equal to the pavers
  • Place pavers and fill gaps with sand
  • Clean up the area
  • Education Wing Basement
  • Office Furnace Room
  • 112 Chair/Table Storage
  • Winter Equipment storage (stair 2 @ front door)
  • Stair 1 near Room 111
  • Stair  2 near front doors
  • Sweep, clean windows and sills, remove cobwebs
  • Breezeway including windows, sills, and lights
  • Sanctuary windows and sills
  • Classroom windows and sills
  • Clean leaves and debris from garden beds
  • Plant new items as needed
  • Spread mulch
  • Wall in office copier room
  • Office door frames
  • Education building door frames
  • Solid color stain on dumpster gates
  • Repair damaged areas around the parking lots from plowing
  • Breakup mounds of dirt and grass
  • Add topsoil if necessary
  • Spread seed
  • Cover with hay
  • Water
  • Replace emergency EXIT sign at south west corner of sanctuary
  • Install exterior outlets at northeast corner of Education building.
  • Assist lead with setting up tables and food prep

Probably a later morning task